Learn More

Rate Schedules & Fees - Electricity

Rules and Regulations for Service

Florida Sales Tax Exemptions

Residential Service (RS)

Monthly Facilities Charge:

  • Single Phase Service $ 10.00
  • Three Phase Service $ 25.00

Base Energy Charge $ 0.1039 per KWH

Wholesale Power Cost Adjustment $ 0.013 per KWH

Minimum Monthly Charge:

The minimum monthly charge shall be the higher of:

  • The Facilities Charge.
  • Minimum monthly charge established by contractual agreement.
  • $20.00 (plus WPCA) for single phase service.

Outdoor Lighting (OL)

Standard Area/Street Light $ 9.00 per light

  • Energy Charge $3.15
  • Equipment Charge $5.85

Larger than Standard Area Light *$ 14.50 per light

  • Energy Charge $5.08
  • Equipment Charge $9.42

* For existing lights only. No new lights of this type shall be installed.

In Cooperative designated street lighting districts:

  • Monthly Charge $ 1.75 per residence within the boundaries of subdivision.

General Service/Non-Demand (GSND)

Monthly Facilities Charge:

  • Single Phase Service $ 10.00
  • Three Phase Service $ 25.00

Energy Charge: $ 0.1039 per KWH

Wholesale Power Cost Adjustment $ 0.013 per KWH

Minimum Monthly Charge:

The minimum monthly charge shall be the higher of:

  • The Facilities Charge.
  • The monthly charge established by contractual agreement.
  • $20.00 (plus WPCA) for single phase service.

General Service/Demand (GSD)

Monthly Facilities Charge: $ 65.00

Demand Charge

  • Billing Demand in excess of 20KW$ 7.25 per KW

Energy Charge $ 0.0725 per KWH

Wholesale Power Cost Adjustment $ 0.013 per KWH

Minimum Monthly Charge:

The minimum monthly charge shall be the higher of:

  • The Facilities Charge.
  • Minimum monthly charge established by contractual agreement.

General Service Large Demand (GSLD)

  • Facilities Charge $ 300.00
  • Energy Charge $ 0. 06198 per KWH
  • Wholesale Power Cost Adjustment $ 0.013 per KWH
  • Demand Charge $ 7.50 per KW
  • The following credits may be applied to each KW of billing demand:
  • Point of delivery at 12 KV up to 69 KV $ 0.50 per KW
  • Point of delivery at 69 KV or higher $ 1.00 per KW

Minimum Monthly Charge shall be the higher of:

  • The Facilities Charge plus Demand Charge.
  • Minimum monthly charge established by contractual agreement.

All services will be subject to a monthly wholesale power cost adjustment.

Talquin Fees and Charges

  • Membership Fee $ 5.00
  • Initial Connect (New Service Locations) $ 50.00
  • Reconnect Non-Pay Regular Hours $ 25.00
  • Reconnect Non-Pay After Hours $ 60.00
  • Unauthorized Reconnect $250.00
  • Connect Charge Regular Hours (existing service) $ 25.00
  • Connect Charge After Hours $ 60.00
  • Returned Check <$50.00 $ 25.00
  • Returned Check >$50.00 and <$300 $ 30.00
  • Returned Check $300.01 - $800.00 $ 40.00
  • Returned Check $800.01 or greater 5%
  • Deposit2 X average bill (12 months) or minimum of $250.00
  • Residential Energy Analysis - No Fee
  • Commercial Energy Analysis - Tiered Fees - Member Responsible for 25% of Fee
  • Meter Tampering Fee $250.00
  • Meter Test Fee 1-phase $ 20.00
  • Meter Test Fee 3-phase $ 40.00
  • Disconnect/Collection Trip $ 25.00
  • Misc. Service Charge Electric Only $110.00
  • Misc. Service Charge Electric+W+WW $150.00
  • Deposit Credit Check Fee $ 10.00