Rate Schedule S – Wastewater

Rate Schedule S – Wastewater

Available to Members of the Cooperative in those areas where wastewater service has been established.

Water Meter Size
Facilities Charge New System Fee
0.75 inch or smaller $40.69 $8,300
1 inch meter $65.10 $20,750
1.5 inch meter $101.75 $41,500
2 inch meter $146.48 $66,400
3 inch meter $292.95 $132,800
4 inch meter $451.61 $207,500
6 inch meter $923.63 $415,000

Monthly Rate

  • First 5,000 gallons – $5.46 per 1,000 gallons
  • Next 5,000 gallons – $5.46 per 1,000 gallons

Maximum residential monthly rate charge based on greater of A) Highest metered water usage billed during previous months of January, February, March and April; B) 10,500 gallons of water.

Deposit Requirements

Wastewater deposit requirements are 2x’s the average billing at each location with a $50.00 minimum.

New Metered Service Connection Fee

The Connection Fee for all meter sizes shall be the greater of A) $600 or B) the total cost to construct, connect and meter wastewater service lateral.  When required, main line extension construction costs shall be paid as part of the Connection Fee.

Effective Date

With billing commencing October 1, 2022.

New System Fee effective July 21, 2023.

Rate Schedule S- Sewer