Rate Schedule – Electric

Rate Schedule – Electric

Effective Date

With billing commencing September 1, 2016.

Residential Service (RS)

Monthly Facilities Charge:

  • Single Phase Service $30.00
  • Three Phase Service $45.00

Energy Charge:

  • For first 1,000 KWH $0.0995
  • Over 1,000 KWH $0.1211
  • Wholesale Power Cost Adjustment effective September 1, 2016: -$0.0060 per KWH

Minimum Monthly Charge:

The minimum monthly charge shall be the higher of:

  • The Facilities Charge
  • Minimum monthly charge established by contractual agreement
  • $30.00 (plus WPCA) for single phase service

Outdoor Lighting (OL)

  • Standard Area/Street Light $10.25 per light
    • Energy Charge $3.15
    • Equipment Charge $7.10
  • Larger than Standard Area Light *$15.75 per light
    • Energy Charge $5.08
    • Equipment Charge $10.67

* For existing lights only. No new lights of this type shall be installed.

In Cooperative designated street lighting districts:

  • Monthly Charge $2.00 per residence within the boundaries of subdivision.

General Service/Non-Demand (GSND)

Monthly Facilities Charge:

  • Single Phase Service $30.00
  • Three Phase Service $45.00

Energy Charge:

  • For first 1,000 KWH $0.0995
  • Over 1,000 KWH $0.1211
  • Wholesale Power Cost Adjustment effective September 1, 2016:-$0.0060 per KWH

Minimum Monthly Charge:

The minimum monthly charge shall be the higher of:

  • The Facilities Charge
  • The monthly charge established by contractual agreement
  • $30.00 (plus WPCA) for single phase service

General Service/Demand (GSD)

Monthly Facilities Charge:

  • $65.00

Demand Charge

  • Billing Demand in excess of 20KW $7.25 per KW
  • Energy Charge $0.0855 per KWH
  • Wholesale Power Cost Adjustment effective January 1, 2016:-$0.0035 per KWH

Minimum Monthly Charge:

  • The minimum monthly charge shall be the higher of:
    • The Facilities Charge
    • Minimum monthly charge established by contractual agreement

General Service Large Demand (GSLD)

  • Facilities Charge $300.00
  • Energy Charge $0.07498 per KWH
  • Wholesale Power Cost Adjustment- effective January 1, 2016 -$0.0035 per KWH
  • Demand Charge $7.50 per KW
  • Measured monthly KW demand is 1,000 KW or more
  • The following credits may be applied to each KW of billing demand:
    • Point of delivery at 12 KV up to 69 KV $0.50 per KW
    • Point of delivery at 69 KV or higher $1.00 per KW

Minimum Monthly Charge shall be the higher of:

  • The Facilities Charge plus Demand Charge
  • Minimum monthly charge established by contractual agreement

All services will be subject to a monthly wholesale power cost adjustment.


Talquin Fees and Charges

  • Membership Fee $5.00
  • Initial Connect (New Service Locations) $50.00
  • Reconnect Non-Pay Regular Hours $25.00
  • Reconnect Non-Pay After Hours $60.00
  • Unauthorized Reconnect $250.00
  • Connect Charge Regular Hours (existing service) $25.00
  • Connect Charge After Hours $60.00
  • Returned Check <$50.00 $25.00
  • Returned Check >$50.00 and <$300 $30.00
  • Returned Check $300.01 – $800.00 $40.00
  • Returned Check $800.01 or greater 5%
  • Deposit 2 X average bill (12 months) or minimum of $250.00
  • Residential Energy Analysis – No Fee
  • Commercial Energy Analysis – Tiered Fees – Member Responsible for 25% of Fee
  • Meter Tampering Fee $250.00
  • Meter Test Fee 1-phase $20.00
  • Meter Test Fee 3-phase $40.00
  • Disconnect/Collection Trip $25.00
  • Misc. Service Charge Electric Only $110.00
  • Misc. Service Charge Electric+W+WW $150.00
  • Deposit Credit Check Fee $10.00
  • Monthly Meter Reading Charge $40.00

Additional Information

Rules and Regulations for Electric Service

Florida Sales Tax Exemptions